← Back to sourcing notes

BUYER CHECKLIST

How to Compare Supplier Quotes for Bulk Orders

Compare supplier quotes on the same specification, delivery point, weight basis and included costs.

In this guide
  1. Use one written brief
  2. Make inclusions explicit
  3. Check timing and open questions
  4. Keep a final comparison
  5. What to record for each offer
  6. Example of a comparable price
  7. Differences that can change the decision

Use one written brief

Follow the product specifications guide and send the same product description, quantity, destination and packing requirements for each proposal. If one offer uses a different specification or unit, clarify the difference before comparing it.

Make inclusions explicit

Ask which preparation, packing, loading, transport or other services are included in the proposed price. Record the agreed delivery point and clarify any costs that remain outside the proposal.

Check timing and open questions

Review proposed preparation time, sample requirements and any dependencies that could affect the order. Keep assumptions separate from confirmed commitments, including availability of the actual material.

Keep a final comparison

Bring the specification, quantity, unit, packing, price basis, delivery point and outstanding questions into a simple comparison sheet. Reconfirm material changes in writing before moving to an agreement.

What to record for each offer

Use one row per supplier. Record grade, test evidence, currency, price per net tonne, minimum order, packaging, named delivery point, quote validity and lead time. Mark each item as confirmed, pending or excluded.

Example of a comparable price

Offer A is 100 per net tonne before delivery. Offer B is 110 delivered in the same currency. If transporting A to the same delivery point adds 15 per net tonne, A becomes 115 on that basis. Verify that taxes, packing and quantity are treated consistently before comparing totals.

Differences that can change the decision

Highlight differences in minimum order, sample costs and the point where responsibility transfers. Ask each supplier to clarify any assumptions that affect the delivered price or the ability to accept the material.